TEPCO : News | Photos For Press


2011.4.17

Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.

Download

Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
(pictured on April 17, 2011)


2011.4.16

Unit 1,Roof of Reactor Building

Download

Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station

Pictures taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station


2011.4.16

a sandbag containing zeolite

Download

  • a sandbag containing zeolite
    Shooting date: April 15, 2011
    Shooting location: the south side of the screen of Unit 3 of the
    Fukushima Daiichi Nuclear Power Station


2011.4.15

110414 fuelpool

Download

Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station

A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
(pictured on April 14, 2011)

The temporary storage tank at Fukushima Daiichi Nuclear Power Station
(pictured on April 14, 2011)

A picture taken from the concrete pumping vehicle, the spent fuel pool, Unit3, Fukushima Daiichi Nuclear Power Station
(pictured on April 14, 2011)


2011.4.13

110413 cask

Download


2011.4.12

Discharge canal sampling building of Unit 1-4 at Fukushima Daiichi Nuclear Power Station located around the ocean-side discharge canal (When fire was detected)


2011.4.11 (Fukushima DaiIchi Nuclear Power Station)

Before the retroaction of the tsunami
*Please refer to the press
release regarding the places
where those pictures are taken.

Pictures of the damages caused by the tsunami at Fukushima Daiichi Nuclear Power Station

Download


2011.4.11 (Fukushima Daini Nuclear Power Station)

Pictures of the damages caused by the tsunami at Fukushima Daini Nuclear Power Station
*Please refer to the press
release regarding the places
where those pictures are taken.


2011.4.11

110411_1f_1


2011.4.11

110411_1f_system1_1

Download

Removal of Rubbles by Remotely Controlled Heavy Machinery (System 1)(pictured on April 6, 2011)


Loading of Rubbles (approx.2 hours)
Temporary Rubble Yard (approx. 1 hour)


2011.4.9

110409_1f_tsunami_1


2011.4.8

110408 base-isolation


2011.4.7

110407 MegaFloat


2011.4.6

110406 Fukushima Daiichi


2011.4.2

110402 Fukushima Daiichi

Download


2011.4.2

110402 Fukushima Daiichi


2011.4.1

110401 Fukushima Daiichi

Download


2011.4.1

110401 Fukushima Daiichi


2011.3.29

110329 Fukushima Daiichi


2011.3.27

110326 Fukushima Daiichi


2011.3.24

110324 Fukushima Daiichi


2011.3.24

110324 Monitoring Post Image

Download


2011.3.23

110323 Fukushima Daiichi


2011.3.23

110323 Fukushima Daiichi


2011.3.22

110322 Fukushima Daiichi


2011.3.21

110321 Fukushima Daiichi

Download


2011.3.17

110316 Fukushima Daiichi


2011.3.16

110316 Fukushima Daiichi

Download


2011.3.13

110313 Fukushima Daiichi

Download

Posted via email from tcyhhd's posterous